Suisse Pliage — Installation guide FLAT PARAPET COPING INSTALLATIONTechnical guide — step-by-step installation for building professionals. |
|
📋 Technical tutorial Complete installation procedure for a flat parapet coping with clip-on system on grooved brackets — from surface preparation to finishing. |
🔧 Required tools
|
📐 General view ![]() |
|
Part 01 ⚒ BRACKET INSTALLATION |
|
|
|
3. Positionnement des supports |
|||
|
Position the grooved brackets according to the markings. Check alignment and plumb before drilling.
|
|
|
|
💡 Practical info — Grooved bracket spacing ► Every 1.50 m for copings of 3 m in length ► Every 1.00 m for copings of 2 m or less |
|
Part 02 🏠 COPING INSTALLATION |
|
6. Clipsation de la couvertine |
|
Engage the coping on the first bracket starting from one end. Clip firmly onto each grooved bracket until it clicks into place. Use a rubber mallet if needed to avoid deforming the piece. ![]() |
|
7. Pose d'une seconde couvertine |
|
Position the second coping ensuring sufficient overlap with the first (minimum 30 mm recommended). Check alignment before clipping onto the next brackets. ![]() |
|
|
|
9. Ajout des embouts de finition |
|||
|
Finish the ends with closure caps to prevent water infiltration and insect entry. Snap into place until fully engaged.
|
|
✅ Summary — 9 installation steps
|
|
Need custom copings? CONFIGURE MY COPING ONLINE ► ACCESS THE CONFIGURATOR |
|
Suisse Pliage — Installation guide FLAT PARAPET COPING INSTALLATIONTechnical guide — step-by-step installation for building professionals. |
|
📋 Technical tutorial Complete installation procedure for a flat parapet coping with clip-on grooved bracket system. |
|
🔧 Required tools ► Drill / screwdriver ► Drill bits (concrete / block) ► Anchors and stainless screws ► Pencil / tape measure / level ► Rubber mallet ► Snips or hacksaw |
|
📐 General view ![]() |
|
Part 01 ⚒ BRACKET INSTALLATION |
|
1. Nettoyer la surface |
|
Remove dust, rubble and loose parts. The surface must be clean and sound before any fixing. ![]() |
|
2. Placer l'angle et tracer les extrémités |
|
Position the coping angle at the end. Mark with a pencil the bracket locations along the parapet. ![]() |
|
3. Positionnement des supports |
|
Position the grooved brackets according to the markings. Check alignment and plumb before drilling. ![]() |
|
4. Perçage des supports et du mur |
|
Drill through the bracket and wall simultaneously with a bit suitable for the material (concrete, block, brick). ![]() |
|
5. Installation des chevilles et vissage |
|
Insert the anchors into the drilled holes. Firmly fix the grooved brackets with stainless screws. ![]() |
|
💡 Bracket spacing ► Every 1.50 m for 3 m copings ► Every 1.00 m for copings 2 m and under |
|
Part 02 🏠 COPING INSTALLATION |
|
6. Clipsation de la couvertine |
|
Engage the coping on the first bracket. Clip firmly until it clicks. Use a rubber mallet if needed. ![]() |
|
7. Pose d'une seconde couvertine |
|
Minimum 30 mm overlap recommended. Check alignment before clipping. ![]() |
|
8.1 Éclisse extérieure |
|
Place the external splice at the junction to ensure waterproofing and conceal the expansion joint. ![]() |
|
8.2 Éclisse intérieure (alternative) |
|
More discreet alternative: inserted inside the profile. ![]() |
|
9. Embouts de finition |
|
Finish ends with closure caps. Snap into place until fully engaged. ![]() |
|
✅ Summary — 9 steps
|
|